The operations manager of a large production plant would like to estimate
the average amount of time workers take to assemble a new electronic component.
After observing a number of workers assembling similar devices, she guesses
that the standard deviation is 6 minutes. How large a sample of workers
should she take if she wishes to estimate the mean assembly time to within
21 seconds. Assume the confidence level to be 91%.
Sample Size =